Power plant flexibilization in Manaus (Brazil)

Power plant flexibilization in Manaus (Brazil)

While MTU Power was retrofitting an LM6000 industrial gas turbine at its facility in Berlin-Brandenburg, the package team had the task of adapting the package to suit the needs of the new turbine. Work included building and attaching the water injection pump, new diffuser, integrating new control and management systems as well as laying new foundations and adapting ducts and cables to new switching boxes for the new signal systems.

Interested in a similar workscope or have questions? Please contact:

Janko Matheussik
Project Manager Power Plants
Phone: +49 3378 824-332
Cell: +49 176 10445594
janko.matheussik@mtu.de
Phone: +49 3378 824-332
Cell: +49 176 10445594
janko.matheussik@mtu.de
  • Increased power output
  • Guaranteed power supply
  • Efficiency improvement
  • Lower emissions
  • Reliable grid stability
  • Upgrade water injection system  for NOx reduction
  • Performance upgrade (PAàPC)
  • New monitoring and control units
  • Piping and wiring
  • Nitrogen oxide reduction to 25 ppm
  • Power augmentation up to 10%
  • 2-3% higher efficiency
  • Short payback time
  • Higher flexibility and availability
  • Lower lifecycle costs
  • Extended lifetime
  • Fleet harmonization

Power plant flexibilization in Manaus (Brazil)