Controls and fuel system upgrade (Spain)


MTU Power upgraded the control and fuel system for a long-standing Spanish customer.
 

Requirements and challenges

  • Woodward gas valve/actuator assembly obsolete
  • No spare parts availability

Solution and scope of supply

  • Upgrade of the current gas valve assembly system
  • Exchange of gas metering valve and fuel legs
  • New DVP drivers
  • CPU and core software upgrade

Results and benefits

  • High availability of spare parts ensures high engine availability
  • Able to reuse the fuel leg
  • Full support for new digital valve positioner DVP
  • Economical and reliable solution